Take me home
SCi:
CDi3.FTe Submersible, Universal Gas-Field Controller
Keller Digital Pressure Transducers/Transmitters
Burkert Solenoid Modifications
PDL/CDi History: Pembina Lake Erie Datalogger
LD Series Pressure Transmitters
Products:
CDi.P5.FTe Submersible Natural Gas Flowmeter
Long Range RF Link (900MHz)
CDiComm Remote Monitoring and Control Software
CDi.P5.Sw Submersible Natural Gas Flowmeter and Intermitter
CDi3.FTe Submersible, Universal, Gas Field Controller
ZDL5 Simple Submersible Flowmeter
CDi.P5.FTe Updates
Last Update: Sunday, April 01, 2018 10:15:59 AM
1
CDi.P5.FTe#80
Comments:
  • One of 15 P5's built in 2006, #74 to 88.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2006
2013 - July
0.0
399
NA
NA
NA
13/4 @ 130
1/4 @ 130
5983
257.0
7225
2
CDi.P5.FTe#81
Comments:
  • One of 15 P5's built in 2006, #74 to 88.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2006
2013 - July
0.0
402
NA
NA
NA
13/4 @ 130
1/4 @ 130
5980
253.0
7437
3
CDi.P5.FTe#82
Comments:
  • One of 15 P5's built in 2006, #74 to 88.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2006
2013 - July
0.0
167
NA
NA
NA
13/4 @ 130
1/4 @ 130
5980
253.0
7136
4
CDi.P5.FTe#86
Comments:
  • One of 15 P5's built in 2006, #74 to 88.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2006
2013 - July
0.0
-230
NA
NA
NA
2 @ 30
1/2 @ 30
5980
253.0
6744
5
CDi.P5.FTe#73
Comments:
  • Pre-Switcher plunger lift. One of 4 built in 2005, #70 to #73.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • Charged, solenoid calibrated May 2016
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2005
2013 - July
0.0
73
0.0
59
VE245
5890
253.0
13970
310.0
17188
6
CDi.P5.FTe#70
Comments:
  • Pre-Switcher plunger lift. One of 4 built in 2005, #70 to #73.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • Neoprene seal (Black).
  • No cap.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2005
2013 - Sept
0.0
-1118
NA
NA
NA
-1 @ 40
+3/16 @ 40
5880
236.0
5383
NA
NA
7
CDi.P5.FTe#72
Comments:
  • Pre-Switcher plunger lift. One of 4 built in 2005, #70 to #73.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • Charged, solenoid calibrated May 2016
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2005
2013 - Sept
0.0
175
NA
NA
VE245
5890
275.0
7655
NA
NA
8
CDi.P5.FTe#74
Comments:
  • One of 15 P5's built in 2006, #74 to 88.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • Neoprene seal (Black)
  • No cap.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2006
2013 - Sept
0.0
416
NA
NA
NA
-1 @ 40
+3/16 @ 40
5981
258.0
7588
NA
NA
9
CDi.P5.FTe#75
Comments:
  • One of 15 P5's built in 2006, #74 to 88.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • Neoprene seal (Black)
  • No cap.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2005
2013 - Sept
0.0
468
NA
NA
NA
-1 @ 40
+3/16 @ 40
5981
310.0
9021
NA
NA
10
CDi.P5.FTe#66
Comments:
  • One of 10 P5's built in 2005, #60 to #69.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • Neoprene seal (Black)
  • No cap.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2005
2013 - Sept
0.0
419
NA
NA
NA
-1 @ 40
+3/16 @ 40
5981
266.0
7689
NA
NA
11
CDi.P5.FTe#68
Comments:
  • One of 10 P5's built in 2005, #60 to #69.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • Neoprene seal (Black)
  • No cap.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2005
2013 - Sept
0.0
316
NA
NA
NA
-1 @ 40
+3/16 @ 40
5981
264.0
7648
NA
NA
12
CDi.P5.FTe#87
Comments:
  • One of 15 P5's built in 2006, #74 to 88.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • Neoprene seal (Black)
  • No cap.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2006
2013 - Sept
0.0
452
NA
NA
NA
-1 @ 40
+3/16 @ 40
5981
289.0
8412
NA
NA
13
CDi.P5.FTe#61
Comments:
  • #61, one of 10 P5's built in 2005, #60 to #69.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • EPDM seal (Black), vacuum option.
  • No cap.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2005
2015 - May
0.0
81
NA
NA
NA
VE230
5986
110.0
1823
NA
NA
14
CDi.P5.FTe#63
Comments:
  • #63, one of 10 P5's built in 2005, #60 to #69.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • EPDM seal (Black), vacuum option.
  • No cap.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2005
2015 - May
0.0
117
NA
NA
NA
VE230
5986
96.0
2664
NA
NA
15
CDi.P5.FTe#77
Comments:
  • #77, one of 15 P5's built in 2006, #74 to 88.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • EPDM seal (Black), vacuum option.
  • No cap.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2005
2015 - May
0.0
353
NA
NA
NA
VE230
5986
111.0
3285
NA
NA
16
CDi.P5.FTe#79
Comments:
  • #79, one of 15 P5's built in 2006, #74 to 88.
  • New case and batteries, new quick-connects, re-worked 2-cylinder frame from Steve.
  • EPDM seal (Black), vacuum option.
  • No cap.
Build Date
Rebuild Date
Calibration Pressure
Calibration Casing
U/S D/S TR
Casing TR
Solenoid
Firmware
2005
2015 - May
0.0
-177
NA
NA
NA
VE230
5986
115.0
2886
NA
NA
Contact:
Like us on Facebook
Follow us on YouTube
Follow us on Twitter
SingleChips Greece
SingleChips Cloud
SingleChips Canada
Copyright © 1991-2018 AdamG Last Update: Sunday, April 01, 2018 10:15:59 AM